SĪPELES
Designer’s comment
This project was a professional challenge for me at the highest level. We started to create the interior concept at a time when the site was already in full swing with large-scale construction work and room renovation. The garage was transformed into a Master zone with a panoramic window to the courtyard, warm floors, a recuperation system were introduced, and windows were partially replaced.
The furniture design took place in very difficult conditions - without ready-made floors, ceilings, and a stable room structure, with several construction teams working in parallel. As a designer, I had to simultaneously coordinate processes, anticipate technical nuances, and flexibly adapt solutions to the changing situation on the site.
Despite the pressure and deadlines, I deliberately chose not to compromise. The priority was the highest-level result - functional, spacious, and aesthetically clean furniture for a large family. In collaboration with Camillo, we managed to develop individual, technically precise solutions that perfectly integrate into the architecture and everyday life scenarios.
I designed the interior in a neutral, warm color scheme that is contemporary and sustainable over time. As a unifying element throughout the house, I chose the Egger wood texture, which gives the rooms elegance and coziness, while maintaining visual unity.
I always look at challenges as part of the process – and this project proved once again that the most difficult conditions often produce the most valuable results.
Project details
The furniture was made of high-quality materials:
- EGGER facades with wood texture
- Natural stone surface
- Integrated built-in appliances (oven, stove, refrigerator, dishwasher, wine cabinet)
- Modern LED lighting
- Custom solutions for wardrobes and fireplace furniture
- Diverse use of BLUM mechanisms
Work process
The project was implemented in several stages:
- Initial consultation and room measurement
- Selection and approval of materials, fittings
- Coordination of technical solutions with the project author
- Furniture production
- Installation and final works The total project duration was 10 weeks from the first meeting to the final handover.
Result
A unified and flowing space, where the interplay of materials and textures is visible with smart storage solutions and successful integration of lighting into the interior.